Project Description

Location: Bassano, Alberta, Canada

Consultant: MPE Engineering

Owner: Eastern Irrigation District

The Bassano Dam Emergency Spillway was Completed in May of 2019. Instream water control projects won the supply contract of all ten radial gates, embedment’s, cable hoists and stop logs.

These radial gates measure 35 feet wide by 15 feet tall and are driven by Electrically controlled cable hoists. Instream WCP partnered with Graham Construction as a sub contractor to fully install and Commission all of the gate related equipment in this 40 million dollar structure.